Box type polyethylene (PE) built-in sewage lifting
For environments where gravity flow drainage is not possible or the drainage point is too far from the horizontal distance of the drainage riser, suitable for conventional basements, garages, villas, etc
High density PE material with multi directional reserved installation ports
The water pump is built-in and highly integrated with automatic coupling
Supporting control system, safe, stable, energy-saving, and consumption reducing
Conventional product series for water supply and drainage
Secondary water supply series smart equipment
Modular Smart Integrated Water Plant
Add: No. 466 Jinbai Road, Jinshan Industrial Zone, Shanghai
Service hotline: 400-821-3003
Fax: 0086-21-67227688
E-mail: ym@ym-sh.com
Web: http://www.ym-sh.com
Copyright © 2020 Shanghai Yimai Industrial City Co., Ltd ALL RIGHTS RESERVED Design & Promotion:Feisu.cn